Floatation test and load tests for the first concrete pontoon for the Marina El Alamein construction project
The floatation and load tests of the first concrete pontoon for the Alamein Marina project were successfully completed. The company constructed the pontoon according to the approved project designs, signaling the start of mass production. Representatives from the general consultant and the marina’s