Our Projects

Damietta Port grain quay, 850 meters long (panel walls)

Panel walls construction of a 984-meter-long quay from Ain Sokhna

Development of the northern zone berths at Port Said Shipyard

Design and implementation of concentration points for the Canal Company crews (first phase)

Al Bardaweel lake Breakwaters

RAS EL-BAR Breakwaters

Protection of the banks of the Nubariya Canal and dredging from km 46 to km 61 with a total length of 16 km

Dredging Sirt port –LIBYA

Damietta Port grain quay, 850 meters long (panel walls)

Panel walls construction of a 984-meter-long quay from Ain Sokhna

Development of the northern zone berths at Port Said Shipyard

Design and implementation of concentration points for the Canal Company crews (first phase)

Al Bardaweel lake Breakwaters

RAS EL-BAR Breakwaters

Protection of the banks of the Nubariya Canal and dredging from km 46 to km 61 with a total length of 16 km

Dredging Sirt port –LIBYA

CHP