FERDAN FERRY BERTHS – ISMAILIA
- Project's owner
- Year Of Execution
- Project's Cost
- Duration
- Suez Canal Authority
- 1998
- 750.000 LE
- 5 Years
FERDAN FERRY BERTHS – ISMAILIA
SARAPIUM FERRY BOAT BERTHS ISMAILIA
PORT FOAD FERRY BOATS BERTHS - PORT SAID
The project is reconstruction of breakwater
The project is reconstruction of two breakwater
Phase 1: Construction of 5 breakwaters Phase 2: Construction of 3 breakwaters
The project is reconstruction the main breakwater
• Construction of four quays: - One of 240 meter length and 4 meter depth. - One of 130 meter length and 7 meter depth. - One of 170 meter length and 9 meter depth. - One of 210 meter length and 12 meter depth.
The project is construction of fishing port for trawlers at Hurghada (Turnkey).