Damietta Port grain quay, 850 meters long (panel walls)
Panel walls construction of a 984-meter-long quay from Ain Sokhna
Development of the northern zone berths at Port Said Shipyard
Design and implementation of concentration points for the Canal Company crews (first phase)
Al Bardaweel lake Breakwaters
RAS EL-BAR Breakwaters
Protection of the banks of the Nubariya Canal and dredging from km 46 to km 61 with a total length of 16 km
Dredging Sirt port –LIBYA
Damietta Port grain quay, 850 meters long (panel walls)
Panel walls construction of a 984-meter-long quay from Ain Sokhna
Development of the northern zone berths at Port Said Shipyard
Design and implementation of concentration points for the Canal Company crews (first phase)
Al Bardaweel lake Breakwaters
RAS EL-BAR Breakwaters
Protection of the banks of the Nubariya Canal and dredging from km 46 to km 61 with a total length of 16 km

